Milling and turning in the same production facility.
Production capability and quality · Estonia
Agreed requirements. Inspected work.
8 Okuma CNC machines in Estonia. Drawing tolerances within machine capability; all necessary measuring equipment is in place.
Quality
We meet drawing requirements and stand behind our work.
We hold drawing tolerances within the capability of the Okuma machines.
Series and repeat orders come from the same revision, program and inspection plan.
All necessary measuring equipment is in place.
Measurement report and material certificate on request.
Inspection
Drawing first, then chips.
Inspection is part of every order.
Drawing review material, GD&T, Ra
First article measured against the drawing
In process inspection per the inspection plan
Final inspection before packing; report on request
Services
Four services, one production facility.
Milling, turning, fixtures and assembly in the same production facility.
Milling
Okuma M560 and M460 machining centres
View millingTurning
Okuma LB300 MYW with driven tools and sub-spindle
View turningFixtures and special equipment
design in SolidWorks and manufacture
View fixturesAssembly service
sub-assemblies and assemblies, welding as part of the assembly
View assemblyMachine park
CNC park in Estonia.
8 Okuma CNC machines and 2 CNC-controlled bandsaws.
Ketmas production floor
Capability
Extra capability when needed.
When needed we build an additional fixture, expand measurement or acquire equipment.
The machine park has grown with orders: one machining centre in 2016, 8 Okuma CNC machines today.
See: prototype to seriesFAQ
Frequently asked questions.
Tolerances, measurement and documents.
What tolerances can you hold?
Drawing tolerances within the capability of the Okuma machines. All necessary measuring equipment is in place.
Can we get measurement or material documents?
Yes: measurement report, EN 10204 3.1 material certificate and declaration of conformity on request.
Do you have ISO 9001?
No. We work to the requirements of the drawing and the order and stand behind our work. A measurement report and material certificate are available on request.
What if current equipment is not enough?
When needed we build an additional fixture, expand measurement or acquire equipment.
Quote
Enquiry with quality requirements.
Drawing, material, quantity and required documents. We reply with price and lead time.
Request a quote