Drawing and version
revision + changes
CNC production · Estonia
Same drawing revision, process method and inspection from the first approved piece through series. A batch does not start from zero.
Continuity
With the first approved part we fix feasibility. In series we carry forward revision, fixturing and inspection.
Series may optimise the method; revision, requirements and inspection points must remain.
revision + changes
material + critical characteristics
fixturing, fixture, process sequence
critical characteristics
Workflow
Typical sequence from single part to repeat order — step weight depends on the part.
CAD + requirements
feasibility / DFM
FAI
approval / revision
series method
repeat order
Volumes
Higher volume → more fixturing, tooling, inspection stabilisation.
01 / single part
02 / prototype and first batch
03 / repeat series
Ketmas production
Case
Input, FAI, changes, series baseline.
Series quality
Revision + method + inspection points = repeatable batch.
QualityRequirement requirements
First article FAI
Work process
Repeat repeat
We grow with customers
When needed we build fixtures, expand measurement or add equipment — if the job requires it.
Goal: stable series, less variation, one partner.
Practical questions
Drawing, quantity, critical requirements, recurrence.
Yes. Single/prototype alone or as a prelude to series. Feasibility from the drawing.
Not necessarily — in series we optimise fixturing/inspection; revision remains the baseline.
Typically: revision, program, fixture, inspection plan — scope per job.
Yes. When needed: fixture, measurement, process or machine.